91精品国产91久久久久久_国产精品二区一区二区aⅴ污介绍_一本久久a久久精品vr综合_亚洲视频一区二区三区

合肥生活安徽新聞合肥交通合肥房產生活服務合肥教育合肥招聘合肥旅游文化藝術合肥美食合肥地圖合肥社保合肥醫院企業服務合肥法律

代寫MATH6119、Python/c++編程語言代做

時間:2024-05-15  來源:合肥網hfw.cc  作者:hfw.cc 我要糾錯



Case Study - Information Sheet
Printed Circuit Board Assembly
1 Background
Philips Electronics produces printed circuit boards (PCBs) for use in consumer electronics (audio and video equipment, personal computers) and in professional industries
(telecommunication systems, aircraft navigation, medical equipment). Special machines
are used to mount components onto the boards. The problem to be considered is one
of production preparation: for each type of PCB, it is necessary to specify the way in
which the components should be mounted.
This case study is based on work carried out for one of the major product divisions
of Philips. Although some simplifications have been made to the original problem, this
does not affect the main characteristics of the decisions that have to be taken.
2 Assembly of PCBs
PCBs are assembled by automated machines. A conveyor feeds each board into the first
machine, and transports the boards between machines. Thus, a board passes into the
first machine where a selected subset of components are mounted, then passes to the
second machine where further component mountings are performed, and so on, until the
last machine completes the PCB. The conveyor moves all partially assembled boards to
the next machine simultaneously. Thus, the conveyor only moves when every machine
has completed its work on a board. For example, if there are eleven components to be
mounted by three machines, A, B and C, where machine A mounts components 1, 2,
3 and 4 and takes 8 seconds, machine B mounts components 5, 6 and 7 and takes 12
seconds, and machine C mounts components 8, 9, 10 and 11 and takes 9 seconds, then the
conveyor moves the boards every 12 seconds. Consequently, the first PCB is completed
after 36 seconds, and a further PCB is completed at the end of each subsequent 12-second
interval.
The components to be mounted on the board are contained in feeders on one side of
the conveyor. The components are classified into different types, and each feeder only
contains components of a single type.
Each machine has a robot arm with three heads. The heads are each fitted with a
piece of equipment which can pick components from the feeders and subsequently place
them on the board. At most one component at a time can be carried by a head. Note that
each component type can only be handled by a subset of the set of head equipments. In
other words, a head with a given piece of equipment can only pick and place components
of a limited set of component types.
The mounting process consists of a sequence of pick-and-place moves. In the picking
phase, the heads pick a component from the relevant feeders in turn. The order is
fixed: the first head picks first, then the second, and finally the third head. During
1
the placing phase, the robot arm moves to appropriate points on the board so that
the components can be sequentially mounted. In contrast to the picking, the order in
which the components are mounted can be chosen. Note that it is possible to choose
pick-and-place moves in which only one or two of the three heads are used.
To illustrate the process, consider the following example in which a single machine is
used to mount five components on a board. There are two components of type α, one of
type β, and two of type γ. The feeders for these component types have coordinates (5,
0), (10, 0), and (15, 0), respectively. Further, the two α components have to be mounted
at locations with coordinates a1 = (10, 2) and a2 = (10, 12), the β component has to
be mounted at a location with coordinates b1 = (6, 5), and the two γ components have
to be mounted at locations with coordinates c1 = (15, 8) and c2 = (14, 16). Suppose
that, on the first pick-and-place move, the second α component is assigned to head 1,
the β component is assigned to head 2, and the first γ component is assigned to head
3, and that these components are mounted in the order γ, α and β. Then, the robot
arm moves successively between locations (5, 0), (10, 0), (15, 0), (15, 8), (10, 12) and
(6, 5): a total distance of 5 + 5 + 8 + √
41 + √
65 = **.49. Suppose that on the second
pick-and-place move, the first α component is assigned to head 1, and the second γ
component is assigned to head 2, and that these components are mounted in the order
α and γ. Starting at the location (6, 5) where the last component was mounted on the
previous move, the robot arm moves successively between locations (5, 0), (15, 0), (10, 2)
and (14, 16): a total distance of √
26 + 10 + √
29 + √
212 = 35.04. These pick-and-place
moves are illustrated in Figures 1a and 1b, respectively.
Figure 1: (a) First pick and place move; (b) Second pick and place move (the solid line
denotes the route travelled by the arm during this move)
2
3 Throughput
It is required to maximize the throughput of the assembly line, which is determined by
the machine with the heaviest workload. The workload of a machine is proportional to
the total distance travelled by the robot arm. In computing this distance, you should
assume that, when the conveyor moves, the robot arm remains at the position where the
last component was placed until the new board arrives. Increased throughput is achieved
by:
• avoiding large movements of the robot arm;
• balancing the workload between machines.
The scheme that is selected should minimize the time required for the busiest machine
to complete all of its mounting operations.
4 Data
Relevant data for the problem are as follows. There are three machines, and 102 components to be mounted on the board. The components are of 10 different types, which are
labelled as type A, type B, etc., up to type J. There are nine pieces of equipment which
are to be fitted on the heads, and no piece of equipment is duplicated. The following
table lists the equipment, giving the component types that each piece of equipment can
handle.
Piece of equipment Types of components that can be mounted
Figure 2 displays the feeder positions, and shows the positions of the component
types on the board. The feeders for components of types A, . . . , J have coordinates (2,
0), . . ., (11, 0), respectively. The board is depicted below the feeders. The components
to be mounted at the top of the board have coordinates (1, 2), . . . , (12, 2), and the
components to be mounted at the bottom of the board have coordinates (1, 13), . . . ,
(12, 13). There are some locations on the board where no component is to be fitted.
For example, no component is required at the position with coordinated (9, 5), while a
component of type J is to be mounted at the position with coordinates (10, 5).
Note that the times required to pick a component from a feeder, to mount a component on a board, and to move the board on the conveyor are neglibible.
eeders
Figure 2: Layout of the PCB board
請加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp









 

掃一掃在手機打開當前頁
  • 上一篇:代做DTS204TC、代寫Java編程語言
  • 下一篇:CSC4140代做、代寫Python/Java編程設計
  • 無相關信息
    合肥生活資訊

    合肥圖文信息
    2025年10月份更新拼多多改銷助手小象助手多多出評軟件
    2025年10月份更新拼多多改銷助手小象助手多
    有限元分析 CAE仿真分析服務-企業/產品研發/客戶要求/設計優化
    有限元分析 CAE仿真分析服務-企業/產品研發
    急尋熱仿真分析?代做熱仿真服務+熱設計優化
    急尋熱仿真分析?代做熱仿真服務+熱設計優化
    出評 開團工具
    出評 開團工具
    挖掘機濾芯提升發動機性能
    挖掘機濾芯提升發動機性能
    海信羅馬假日洗衣機亮相AWE  復古美學與現代科技完美結合
    海信羅馬假日洗衣機亮相AWE 復古美學與現代
    合肥機場巴士4號線
    合肥機場巴士4號線
    合肥機場巴士3號線
    合肥機場巴士3號線
  • 短信驗證碼 目錄網 排行網

    關于我們 | 打賞支持 | 廣告服務 | 聯系我們 | 網站地圖 | 免責聲明 | 幫助中心 | 友情鏈接 |

    Copyright © 2025 hfw.cc Inc. All Rights Reserved. 合肥網 版權所有
    ICP備06013414號-3 公安備 42010502001045

    91精品国产91久久久久久_国产精品二区一区二区aⅴ污介绍_一本久久a久久精品vr综合_亚洲视频一区二区三区
    91精品国产一区二区| 亚洲综合社区| 日韩欧美一区二区视频| 亚洲成年人网站在线观看| 99热这里都是精品| 欧美一区永久视频免费观看| 免费成人在线影院| 久久精品国产第一区二区三区最新章节 | 欧美日韩一区二区三区高清| 亚洲18色成人| 国产九九精品| 一区二区在线看| 亚洲一级电影| 国产精品久久久久久久久免费桃花| 国产成人在线网站| 在线电影欧美成精品| 国产揄拍国内精品对白| 色婷婷av一区二区| 丝袜美腿亚洲一区| 久久精品国产第一区二区三区最新章节| 国产精品白丝在线| 亚洲国产一区二区三区高清| 《视频一区视频二区| 国产精品激情电影| 国产精品黄色在线观看| 国产综合18久久久久久| 国产精品家庭影院| 最近看过的日韩成人| 亚洲码国产岛国毛片在线| 亚洲午夜精品久久久久久app| 国产欧美中文在线| 久久影院亚洲| 麻豆91免费看| 91精品免费观看| 成人永久免费视频| 久久精品视频免费观看| 欧美在线网站| 亚洲色图丝袜美腿| 久久国产成人| 经典三级视频一区| 在线成人免费观看| 99riav久久精品riav| 日本一区二区三区四区在线视频| 欧美日韩国产三区| 亚洲美女视频一区| 久久综合导航| 国产一区二区三区蝌蚪| 精品国偷自产国产一区| 欧美黄色精品| 亚洲精品国产无套在线观| 久久成人资源| 国产毛片精品国产一区二区三区| 2021久久国产精品不只是精品| 欧美日韩国产精品一卡| 亚洲精品亚洲人成人网| 91福利精品视频| 激情久久五月天| www国产亚洲精品久久麻豆| 国内揄拍国内精品久久| 亚洲福利视频一区二区| 欧美一区二区在线不卡| 欧美日韩三区四区| 日本在线不卡一区| 精品欧美乱码久久久久久1区2区| 国产在线日韩| 日韩成人一级片| 日韩欧美中文字幕一区| 在线日本成人| 麻豆精品在线播放| 国产欧美精品一区aⅴ影院| 亚洲综合三区| 丁香婷婷深情五月亚洲| 亚洲欧美精品午睡沙发| 欧美欧美欧美欧美| 国产伊人精品| 国产在线一区二区综合免费视频| 国产人久久人人人人爽| 先锋影音一区二区三区| 国产精品资源网站| 综合网在线视频| 欧美精品第1页| 亚洲国产一区在线| 国产高清视频一区| 一区二区三区国产精品| 日韩亚洲欧美在线| 国产精品一区视频| 成人免费不卡视频| 日韩电影免费在线观看网站| 国产欧美一区二区三区在线老狼| 日本高清不卡一区| 在线观看成人一级片| 国产98色在线|日韩| 亚洲3atv精品一区二区三区| 国产无人区一区二区三区| 91成人免费在线| 在线免费观看欧美| www.亚洲在线| 美女视频第一区二区三区免费观看网站| 国产欧美一区二区三区沐欲| 欧美喷水一区二区| 麻豆av一区二区三区| 欧美网站在线| 国产精品一区二区久激情瑜伽| 亚洲一区二区三区在线看| 久久婷婷久久一区二区三区| 欧美日韩国产综合草草| 在线亚洲国产精品网站| 99re亚洲国产精品| 国产精品一区二区三区99| 日韩精品欧美成人高清一区二区| 成人免费一区二区三区视频| 337p日本欧洲亚洲大胆色噜噜| 欧美午夜精品免费| 亚洲尤物精选| 亚洲精品在线观看免费| 欧美777四色影| 国产a区久久久| 久久激情综合网| 午夜日韩在线电影| 亚洲欧美另类在线| 国产精品久久久久久久久免费相片 | 国产片一区二区三区| 日韩精品中文字幕在线一区| 欧美三区在线观看| 色婷婷av一区| 色欲综合视频天天天| 亚洲一区欧美二区| 99亚洲伊人久久精品影院红桃| 欧美精品不卡| 欧美视频久久| 色综合婷婷久久| 色综合视频在线观看| 国产成人av一区二区三区在线| 另类中文字幕网| 久久精品免费看| 日本特黄久久久高潮| 丝袜a∨在线一区二区三区不卡| 一区二区三区.www| 亚洲一区二区三区精品在线| 一区二区三区在线免费视频| 一区二区三区资源| 一卡二卡欧美日韩| 偷偷要91色婷婷| 午夜欧美在线一二页| 午夜私人影院久久久久| 三级精品在线观看| 老司机精品视频线观看86| 精品影院一区二区久久久| 国产乱一区二区| 国产乱一区二区| 成人av资源在线| 91麻豆精东视频| 欧美先锋影音| 中文日韩欧美| 久久久久se| 欧美性大战久久| 欧美高清一级片在线| 精品国产成人系列| 中文字幕精品一区二区三区精品| 国产精品成人在线观看| 亚洲宅男天堂在线观看无病毒| 亚洲国产精品久久一线不卡| 亚洲成人黄色小说| 久久99国产精品成人| 国产福利一区二区三区视频在线 | 久久精品国产久精国产爱| 国产精品一区在线观看乱码| 99久久99久久久精品齐齐| 国内精品久久国产| 国产一区二区三区久久| 色国产综合视频| 日韩西西人体444www| 日本一区二区视频在线| 亚洲国产视频a| 国产一区二区三区不卡在线观看| youjizz国产精品| 在线精品亚洲| 色综合久久久久久久| 日韩欧美三级在线| 日韩毛片高清在线播放| 日本一区中文字幕| jlzzjlzz亚洲日本少妇| 日韩图片一区| 欧美日韩国产美| 久久精品一区二区三区不卡牛牛| 亚洲免费av高清| 韩国午夜理伦三级不卡影院| 91网上在线视频| 性娇小13――14欧美| 日韩美女在线视频| 亚洲已满18点击进入久久| 国产精品资源网站| 制服诱惑一区二区| 欧美一级日韩免费不卡| 国产精品福利一区| 国内一区二区在线| 宅男噜噜噜66国产日韩在线观看| 欧美一区二区三区视频在线观看| **欧美大码日韩| 国产精品1024|